GPU Colocation: Power-Ready Racks for H100/B200 Clusters
You own the GPUs. We find the rack: 40 kW air-cooled to 120 kW liquid-cooled positions in Dallas, Ashburn, the Pacific Northwest, the Bay Area, and secondary US markets. One request, quotes from multiple facilities within 24 hours.
- Indicative $130–$300 per kW per month across US markets. See pricing by market
- Liquid-cooled and rear-door heat exchanger racks for DGX H100, DGX B200, and GB200 NVL72
- InfiniBand and 400G Ethernet cross-connects, contiguous rack positions
- No fee to you; the facility pays GYGO
Deploying H100s specifically? H100 colocation requirements
Get quotes from multiple facilities within 24 hours
Tell us your power requirement and region. We match it against partner facilities and send you comparable quotes, free of charge.
Colocation for GPU clusters vs standard colocation
Standard enterprise colocation quotes 5–10 kW per rack and puts your cabinets wherever space is free. Uptime Institute’s 2025 global survey puts the average rack at 7.5 kW, right in the middle of that band. A training cluster breaks both assumptions.
A single DGX H100 pulls about 10.2 kW and a DGX B200 about 14.3 kW. Four H100 systems fill a 40 kW air-cooled rack. A GB200 NVL72 needs roughly 120 kW in one rack and has no air-cooled option, so a building without direct-to-chip liquid cooling can’t take the deployment at all.
Placement matters as much as power. InfiniBand and 400G Ethernet links between racks have to stay inside cable-length limits, so the facility has to hand you contiguous rack positions instead of whatever is free across two halls.
Most buildings can’t do either. In the same Uptime survey, 82% of operators said their densest rack sits below 30 kW, so a 120 kW liquid-cooled deployment rules out the large majority of the market before you start negotiating. That is why we start from your kW and your topology rather than from a list of buildings.
What GYGO brokers
Colocation is the core. If your plan also involves renting, buying, or monetizing GPUs, the same team handles it.
Place (colocation)
Rack space, power, cooling, and cross-connects for GPU clusters you own. This page.
Rent
Compare cloud and bare-metal GPU providers by workload, latency, or cost.
Buy
Source H100, H200, and B200 systems through value-added resellers.
Invest
Turn idle GPU hardware into revenue through leasing and compute programs.
Power and density: air vs liquid
The rack you need depends on the systems you are landing. Most facilities quote per kW, so the density decides both the building and the price.
- About four DGX H100 systems (10.2 kW each) or two to three DGX B200 (14.3 kW each) per rack
- Widely available in Dallas, Ashburn, and Pacific Northwest facilities
- Indicative $5,200–$12,000 per rack per month at $130–$300/kW
- Required for GB200 NVL72 (about 120 kW per rack) and dense B200 deployments
- Scarcer inventory; expect longer lead times and a liquid-cooling premium
- Indicative $15,600–$36,000 per rack per month at $130–$300/kW
GPU colocation cost by market
Indicative all-in $/kW/month, 2026. Full table, hidden costs, and contract terms on the GPU colocation pricing page.
Deep high-density inventory, competitive power, central US latency.
Largest interconnection hub; capacity is tight and priced accordingly.
Low-cost hydro power; best value for training clusters that tolerate distance.
Premium for proximity to AI teams; limited liquid-cooled capacity.
Smaller metros with spare power; longer lead times for 100 kW+ racks.
Indicative ranges compiled from published 2026 broker and operator rate guides; actual quotes vary by density, term, and available capacity.
How it works
- 1
Tell us your kW, region, and timeline
One form. Power requirement, preferred region, and when the hardware lands. GPU model and interconnect help but are optional.
- 2
We collect quotes from matching facilities
We check partner data centers with the density and cooling you need and return comparable quotes within 24 hours.
- 3
You compare and sign with the facility
Pick the quote that fits. You contract directly with the operator. GYGO is paid by the facility, not by you.